Releasing Route Locking

Route Locking Circuit Railway Signalling 

Route Locking Circuit Railway Signalling  Locking of Route In free wired interlocking systems, locking of route is bifurcated into two distinct parts :- 1) Approach Locking – Achieved by dropping of ALSR relay at the time of signal clearance. 2)Back Locking which is popularly called ‘Route Locking’ – Achieved by dropping of USR relays in […]

Continue Reading

PROTECTION OF ENGINEERING WORKS & TRACK SAFETY

PROTECTION OF ENGINEERING WORKS & TRACK SAFETY Safety is the paramount importance in any Transport system. 1. Safety of traveling public 2. Safety of the staff working and 3. Safety of infrastructure. 4. Irregular working of staff is a threat to safety. Rules are framed for a uniform and systematic working. 5. Unauthorized persons are […]

Continue Reading