FOUR FOOT POINT MACHINE

Prototype RS Indicator|Point Selection Schematic|Four Foot Points Machine

Prototype RS Indicator|Point Selection Schematic|Four Foot Points Machine •Route secure indicators are mounted at the side of the track and use LEDs to display a route indication to the train operator. •They are not used in normal operations. •They are used after a failure:  to permit failed trains that cannot communicate with the VCC […]

Continue Reading
SELTRAC System Overview  JNUP Thales

SELTRAC System Overview  JNUP Thales

SELTRAC System Overview  JNUP Thales   Jubilee & Northern Line Upgradation Project (JNUP ) SelTrac – Standard Electronic Lorenz Traffic Routing and Advanced Control Conventional Systems of Train control Conventional Systems and signalling are based on the fixed block principle. Fixed Block Principles 1.The Track is divided in to section or block of fixed length […]

Continue Reading