Railway Signalling Track Circuits  Closed TC  Open Track Circuit Fed over track circuit

Railway Signalling Track Circuits | Closed TC | Open Track Circuit| Fed over track circuit

Railway Signalling Track Circuits | Closed TC | Open Track Circuit| Fed over track circuit A track circuit is a vehicle detection device in which the running rails form part of an electrical circuit. The boundaries of track circuit are marked by insulation joints on the rail and rails are bonded at rail joints for better conductivity. Uses […]

Continue Reading
Railway Signalling Selection Table Control Table

Railway Signalling Selection Table / Control Table

Railway Signalling Selection Table / Control Table In the relay interlocking systems, the safety of train movements in the yard has to be ensured in the various electrical signaling circuits that are prepared for the system. The circuits, therefore, have to be prepared carefully and meticulously and checked thoroughly from the point of view of […]

Continue Reading
Railways Signalling Relays | Shelf type Relays

Railways Signalling Relays | Shelf type Relays

Railways Signalling Relays | Shelf type Relays Relays Relay is an electromagnetic device which is used to convey messages electrically from one circuit to another circuit through a set of contacts (back or front contacts)and works on the principle of electromagnetism. Relays are classified as : According to the source of power applied – DC […]

Continue Reading
Railway Signalling Relay and Circuits nomenclature Presentation

Railway Signalling Relay and Circuits nomenclature Presentation

Railway Signalling Relay and Circuits nomenclature Presentation Equipment Identity Consistency should be maintained for nomenclature marking or labeling on the equipment in circuit diagrams. Terminals of an item of apparatus should be uniquely identified. Terminal numbers/letters should appear as suffixes to the equipment code. A position code may be given for identifying the location of the […]

Continue Reading
Headway Calculation and Signalling braking Distance for Railway Signal Placement

Headway Calculation and Signalling braking Distance for Railway Signal Placement

Headway Calculation and Signalling braking Distance for Railway Signal Placement HEADWAY FOR NON-STOPPING TRAINS * HEADWAY CALCULATION IS THE NECESSARY FIRST STEP IN SIGNALLING A LAYOUT It provide best engineering solution , which meet the conflicting requirements of Operational capacity, Safety & cost. * HEADWAY IS A MEASURE OF HOW FREQUENTLY TRAINS CAN RUN. IT […]

Continue Reading