Metro Rail Signalling and train control system Installation 

Metro Rail Signalling and train control system Installation  Signals – (1) The signals to be provided for controlling the movements of trains on the metro railway shall be, – (a) Cab signals. (b) Fixed line-side signals (where provided). and (c) Hand signals for shunting purposes. (2) The signalling and train control system shall be Continuous […]

Continue Reading

Metro Rail Absence of cab signaling Failure of fixed Signals Failure of route setting

Metro Rail Absence of cab signaling Failure of fixed Signals Failure of route setting Absence of cab signaling (1) Failure of the cab signaling shall initiate an irrevocable emergency brake application. (2) The Train Operator shall report the occurrence to the Traffic Controller and seek instructions. (3) The Traffic Controller shall verify as far as […]

Continue Reading
Work on service building structures vicinity equipment

Work on service building structures vicinity equipment

Work on service building structures vicinity equipment Work on service buildings and structures in the vicinity of live equipment –The Metro Railway employee required to carry out work on service buildings and structures in the proximity of Overhead Equipment shall exercise special care to ensure that tools, measuring tapes, and materials are not placed in […]

Continue Reading

Metro Rail Locomotives work trains maintenance vehicle

Metro Rail Locomotives work trains maintenance vehicle Locomotives, work trains, and maintenance vehicles –(1) Locomotives work trains, and self–propelled maintenance vehicles equipped with Automatic Train Protection equipment shall be worked as per rules of operation for passenger trains. (2) The operator of a self-propelled maintenance vehicle that is permitted to operate on running lines shall […]

Continue Reading
Metro Rail Provision of Signals Working of Signals and points 

Metro Rail Design of Electric Installations

Metro Rail Design of Electric Installations Metro Rail Design of Electric Installations – (1) The design of all electric installations, namely transmission and distribution lines, sub-stations, switching station, rigid overhead current collection system, regulated overhead equipment, third rail DC Traction System etc. as applicable, shall be according to approved standards laid down by the Central […]

Continue Reading