ANR/BNR CIRCUIT

RRI Signal Points With Switche Routes With Buttens NCR RCR RR Relay Circuits

RRI Signal Points With Switches & Routes With Buttens NCR RCR RR Relay Circuits RRI Signal, Points With Switches & Routes With Buttens ANR/BNR CIRCUIT When route button is pressed, the route button relay concerned ANR , BNR etc. picks up. RR RELAY RR RELAY: WHEN THE KNOB REVERSED, THE RR CONCERNED PICKS UP PROVING […]

Continue Reading
Metro Rail Restricted Manual Mode Cut Out Mode

Metro Rail Application of Special Procedure Driver less Train Operation

Metro Rail Application of Special Procedure Driverless Train Operation Application of Special Procedure – Notwithstanding anything contained in these rules, special procedures framed under approved special instructions shall apply to the initial stage of operation or whenever such a condition arises on any section of the Metro Railway. Explanation – For the purposes of this […]

Continue Reading
Metro Rail Restricted Manual Mode Cut Out Mode

Metro Rail Emergency track side work traffic hours

Metro Rail Emergency track side work traffic hours Metro Rail Emergency track side work traffic hours – (1) No routine maintenance shall be undertaken during the hours in which train services normally run except as provided for in sub-rule (2). (2) If emergency repair work is required to be carried out to prevent accidents or to maintain or restore […]

Continue Reading

Railway Point Detection Circuits 

Railway Point Detection Circuits  ‘V’ Style Frame Chairlock Point Circuits The Point Control, Lever Lock and Indication circuits for Chairlocks are identical to the Four  Foot point circuits already discussed. Detection Unlike Four Foot points, a Chairlock layout uses two separate and independent detection units, one for each rail switch. Each unit proves that its corresponding […]

Continue Reading