RAILWAY TRACK SIDE DISCONNECTION BOX & COMBINED CABLE TERMINATION BOX

RAILWAY TRACK SIDE DISCONNECTION BOX & COMBINED CABLE TERMINATION BOX RAILWAY TRACK SIDE DISCONNECTION BOX & COMBINED CABLE TERMINATION BOX: DBOX/CCTB will be used as a cable interconnecting facility between the SER and wayside equipment. DBOX/CCTB will also be used where the cable requirement exceeds the maximum length of the cable available. Cables requiring connections to […]

Continue Reading
SURELOCK POINT S

RAILWAY SURELOCK POINTS

RAILWAY SURELOCK POINTS RAILWAY CLAMPLOCK GROUND LOCK     CLAMPLOCK CONTROL CIRCUITS (L.H. TURNOUT) CLAMPLOCK ELECTRICAL CONNECTIONS   CLAMPLOCK DETECTOR ELECTRICAL CONNECTIONS   CLAMPLOCK DETECTION CIRCUIT (L.H. TURNOUT) * Normal detection: The BX feed enters the right hand unit on terminal ‘E’, passes through the right limit switch first and then through the left switch […]

Continue Reading
ANR/BNR CIRCUIT

RRI Signal Points With Switche Routes With Buttens NCR RCR RR Relay Circuits

RRI Signal Points With Switches & Routes With Buttens NCR RCR RR Relay Circuits RRI Signal, Points With Switches & Routes With Buttens ANR/BNR CIRCUIT When route button is pressed, the route button relay concerned ANR , BNR etc. picks up. RR RELAY RR RELAY: WHEN THE KNOB REVERSED, THE RR CONCERNED PICKS UP PROVING […]

Continue Reading
Configuration & Version Control Signalling Design 

Configuration & Version Control Signalling Design

Configuration & Version Control Signalling Design Presentation Title Block Design details should include an overall border of 5mm with a left hand binding margin of 40mm minimum, with an update block, production block and title block agreed by the records custodian bearing the information required by NR/L2/SIG/11201. A typical layout is shown in NR/L2/SIG/11201, Module A10, […]

Continue Reading