Configuration & Version Control Signalling Design 

Configuration & Version Control Signalling Design

Configuration & Version Control Signalling Design Presentation Title Block Design details should include an overall border of 5mm with a left hand binding margin of 40mm minimum, with an update block, production block and title block agreed by the records custodian bearing the information required by NR/L2/SIG/11201. A typical layout is shown in NR/L2/SIG/11201, Module A10, […]

Continue Reading
RAILWAY SIGNALLING SWITCH & CROSSING COMPONENTS     

RAILWAY SIGNALLING SWITCH & CROSSING COMPONENTS          

RAILWAY SIGNALLING SWITCH & CROSSING COMPONENTS    SWITCHES & CROSSINGS Commonly known as S&C Defined as track components that exist to provide a means whereby trains may be directed from one track or route to another track or route. Consist of: one (or more) sets of switches          common (or acute) crossing and […]

Continue Reading
Platform Emergency Stop Plungers 4

Platform Emergency Stop Plunger(PESP) Railway

Platform Emergency Stop Plunger(PESP) Railway Platform Emergency Stop Plunger(PESP) Railway :- * Five Emergency Stop Plungers shall be provided at each platform for the use of passengers and staffs to stop the train in case of emergency. * One Emergency Stop Plunger for each platform shall be provided in the Station control Room (SCR) panel. * […]

Continue Reading