Platform Emergency Stop Plungers 4

Platform Emergency Stop Plunger(PESP) Railway

Platform Emergency Stop Plunger(PESP) Railway Platform Emergency Stop Plunger(PESP) Railway :- * Five Emergency Stop Plungers shall be provided at each platform for the use of passengers and staffs to stop the train in case of emergency. * One Emergency Stop Plunger for each platform shall be provided in the Station control Room (SCR) panel. * […]

Continue Reading

Railway Electrification Advantages vs Disadvantages, Power supply

Railway Electrification Advantages vs Disadvantages, Power supply Advantages 1. Increased track capacity – Locomotive – Faster and more powerful 2. Less fuel consumption – with employment of regenerative braking fuel consumption is further lowered 3. Electric locomotives are cheaper, have long life, are less complex, have greater reliability, compared to Diesel counterpart 4. Environment friendly Disadvantages […]

Continue Reading
Neutral Section in close up

Railway Overhead Line Equipment

Railway Overhead Line Equipment Overhead Line Equipment (OLE) includes Wires suspended over the railway line for supplying electricity to electric trains, including associated: Fittings Insulators Feeders Switches Jumpers Return conductors OLE wires Catenary wire and Contact wire 1. Catenary wire is carried on insulators or insulated supports attached to the structures. 2. Contact wire is […]

Continue Reading
Railway Signalling Correlation & Correlation Waiver Presentation 

Railway Signalling Correlation & Correlation Waiver Presentation 

Railway Signalling Correlation & Correlation Waiver Presentation  Purpose of Correlation (quotes from NR/L2/SIG/11201 mod A7) Correlation of signalling records and equipment and wiring on site is required to: Check the accuracy of source records prior to any design alteration; To check that records match the actual equipment and wiring at the site they represent. This means […]

Continue Reading