Interface Design

BAMRA APPLICATION LOGIC PROGRAM INTERFACE

BAMRA APPLICATION LOGIC PROGRAM INTERFACE BAMRA APPLICATION LOGIC PROGRAM PROGRAM TITLE   PROGRAM TITLE DISPLAYED ON SCROLLING DISPLAY OF MLKII FOR C1 PROGRAM MICROLOK_II PROGRAM BMB_C1_S01; FOR C2 PROGRAM MICROLOK_II PROGRAM BMB_C2_S01;   LOCAL BIT DEFINITIONS BOARD:  J1 ADJUSTABLE ENABLE:  1 TYPE:  NV.IN32.OUT32 NV.OUTPUT: 1DGKE,           1RGKE,                […]

Continue Reading
The Lever Lock Circuit

Railway Point Lever Lock Circuit & The Indication Circuit

Railway Point Lever Lock Circuit & The Indication Circuit Lever Lock Circuit  Every set of points which has a passenger move over them, must be track locked as discussed in 9.17. Another way of achieving this is to prevent the controlling point lever from moving. In many situations, both methods are used to prevent the […]

Continue Reading
Railway System of Electrical Control

Railway System of Electrical Control

Railway System of Electrical Control Apparatus for remote control of electrical equipment in the switching stations, known as SCADA, is located in Electrical Control Rooms. Each Electrical Control Room is continuously staffed by an Electrical Control Operator (s), who has control of the power supply to the electric traction system, and who is responsible for […]

Continue Reading
Railway Signalling Correlation & Correlation Waiver Presentation 

Railway Signalling Correlation & Correlation Waiver Presentation 

Railway Signalling Correlation & Correlation Waiver Presentation  Purpose of Correlation (quotes from NR/L2/SIG/11201 mod A7) Correlation of signalling records and equipment and wiring on site is required to: Check the accuracy of source records prior to any design alteration; To check that records match the actual equipment and wiring at the site they represent. This means […]

Continue Reading