2 3 4 ASPECT SIGNALLING HEADWAY CALCULATION
2/3/4 ASPECT SIGNALLING HEADWAY CALCULATION ENVISAGING HEADWAY BEFORE SELECTING THE BEST SIGNALLING TYPE FOR THE REQUIRED HEADWAY, A COMPARATIVE STUDY OF THE DIFFERENT TYPES AND THEIR LIMITATIONS MAY BE IN ORDER. TO PERFORM HEADWAY CALCULATIONS, WE CONSIDER TWO TRAINS FOLLOWING EACH OTHER AT FULL-SERVICE SPEED AS SHOWN ABOVE. FIRST, LET US TAKE THE CASE OF TRAIN […]
Continue Reading