<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Wing rails &#8211; Railway Signalling Concepts</title>
	<atom:link href="https://www.railwaysignallingconcepts.in/tag/wing-rails/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.railwaysignallingconcepts.in</link>
	<description>Information About Axle Counter,Track Structure Point &#38; Crossing,Cable Schematics,CBTC Equipment,Overlaps,Core Plans,Earthing,ERTMS,Headway Calculation,Hot Axle Box Detectors,Interface Design,Level Crossing,Markers &#38; boards,Bonding Plan Electrical Lockings,Route locking,Automatic Warning Systems AWS,Point Circuit,Equipment Treadle,Track Layout,Track Circuit Interrupters,Train Protection Warning System (TPWS),Slip Siding &#38; Catch Siding.</description>
	<lastBuildDate>Wed, 01 Jun 2022 08:12:22 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.0.11</generator>
	<item>
		<title>Points and Crossings Railway &#124; Signalling &#038; Interlocking</title>
		<link>https://www.railwaysignallingconcepts.in/points-and-crossings-railway/</link>
					<comments>https://www.railwaysignallingconcepts.in/points-and-crossings-railway/#comments</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Wed, 01 Jun 2022 10:31:40 +0000</pubDate>
				<category><![CDATA[Indian Railway Signalling]]></category>
		<category><![CDATA[Cross over]]></category>
		<category><![CDATA[Diamond crossing]]></category>
		<category><![CDATA[Points and Crossings Railway]]></category>
		<category><![CDATA[Reception Signals]]></category>
		<category><![CDATA[Right-hand Turnout]]></category>
		<category><![CDATA[Starter signals]]></category>
		<category><![CDATA[Stretcher bar]]></category>
		<category><![CDATA[Turn Outs]]></category>
		<category><![CDATA[Wing rails]]></category>
		<guid isPermaLink="false">http://www.railwaysignallingconcepts.in/?p=2743</guid>

					<description><![CDATA[Points and Crossings Railway &#124; Signalling &#38; Interlocking  Signalling &#38; Interlocking Points and Crossings Railway Points and Crossings Railway:- These are the arrangements provided in a railway track to divert a train from the mainline to the branch line. 1 Turn Outs: pair of points and a crossing, to divert a train. 2 Left-hand turnout: if [&#8230;]]]></description>
										<content:encoded><![CDATA[<h1><span style="font-size: 14pt;">Points and Crossings Railway | Signalling &amp; Interlocking</span></h1>
<h2><span style="font-size: 14pt;"> Signalling &amp; Interlocking </span><span style="font-size: 14pt;">Points and Crossings Railway</span></h2>
<p><span style="font-size: 14pt;"><strong><a href="ftp://www.iricen.gov.in/20855-Mechanized%20Track%20Maintenance%20&amp;%20Quality%20Assurance(17%20Aug-2020)/thickweb%20switch%20reconditioning%20and%20speed%20potential%201.pdf">Points and Crossings Railway</a>:-</strong> These are the arrangements provided in a railway track to divert a train from the mainline to the branch line.</span><br />
<span style="font-size: 14pt;"><strong>1</strong> <strong>Turn Outs:</strong> pair of points and a crossing, to divert a train.</span><br />
<span style="font-size: 14pt;"><strong>2 Left-hand turnout:</strong> if the train is diverted to the left of the main track in the facing direction.</span><br />
<span style="font-size: 14pt;"><strong>3 Right-hand turnout:</strong> if the train is diverted to the right of the main track in the facing direction.</span></p>
<h3><span style="font-size: 14pt;"><strong>Left-hand turnout</strong></span></h3>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Left-hand-turnout.jpg"><img loading="lazy" class="alignnone wp-image-2745" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Left-hand-turnout-300x192.jpg" alt="Left hand turnout Points and Crossings Railway" width="577" height="369" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Left-hand-turnout-300x192.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Left-hand-turnout.jpg 641w" sizes="(max-width: 577px) 100vw, 577px" /></a></span></p>
<p>&nbsp;</p>
<h4><span style="font-size: 14pt;"><strong>Right-hand turnout</strong></span></h4>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Right-hand-turnout.jpg"><img loading="lazy" class="alignnone wp-image-2746" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Right-hand-turnout-300x195.jpg" alt="Right hand turnout Points and Crossings Railway" width="577" height="377" /></a></span></p>
<h4><span style="font-size: 14pt;"><strong>Left-hand turnout </strong><strong>/ Right-hand turnout</strong></span></h4>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Both-Left-and-Right-hand-turnouts.jpg"><img loading="lazy" class="alignnone wp-image-2744" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Both-Left-and-Right-hand-turnouts-300x203.jpg" alt="Both Left and Right hand turnouts Points and Crossings Railway" width="579" height="392" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Both-Left-and-Right-hand-turnouts-300x203.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Both-Left-and-Right-hand-turnouts-305x207.jpg 305w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Both-Left-and-Right-hand-turnouts-622x420.jpg 622w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Both-Left-and-Right-hand-turnouts.jpg 637w" sizes="(max-width: 579px) 100vw, 579px" /></a></span></p>
<h5><span style="font-size: 14pt;">Technical Terms</span></h5>
<p><span style="font-size: 14pt;">1. Main track or mainline</span><br />
<span style="font-size: 14pt;">2. Branch track</span><br />
<span style="font-size: 14pt;">3. Flange way clearance</span><br />
<span style="font-size: 14pt;">4. Stock rails</span><br />
<span style="font-size: 14pt;">5. Tongue rails</span><br />
<span style="font-size: 14pt;">6. Stretcher bar</span><br />
<span style="font-size: 14pt;">7. Switch</span></p>
<p><span style="font-size: 14pt;">8. Toe of switch</span><br />
<span style="font-size: 14pt;">9. Heel of switch</span><br />
<span style="font-size: 14pt;">10. Throw of a switch – 9.5cms for B.G</span><br />
<span style="font-size: 14pt;">11. Facing points and facing direction</span><br />
<span style="font-size: 14pt;">12. Trailing points and trailing direction</span><br />
<span style="font-size: 14pt;">13. Check rails</span><br />
<span style="font-size: 14pt;">14. Wing rails</span><br />
<span style="font-size: 14pt;">15. ANC</span><br />
<span style="font-size: 14pt;">16. TNC</span></p>
<h6><span style="font-size: 14pt;">Through Sleepers</span></h6>
<p><span style="font-size: 14pt;">• Sleepers provided under both railway tracks i.e main line and branch line</span><br />
<span style="font-size: 14pt;">• Purpose is to maintain both tracks at the same level</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Through-Sleepers.jpg"><img loading="lazy" class="alignnone wp-image-2747" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Through-Sleepers-300x118.jpg" alt="Through Sleepers Points and Crossings Railway" width="549" height="216" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Through-Sleepers-300x118.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Through-Sleepers.jpg 635w" sizes="(max-width: 549px) 100vw, 549px" /></a></span></p>
<h6><span style="font-size: 14pt;">Interlaced Sleepers</span></h6>
<p><span style="font-size: 14pt;">• Sleepers laid when long sleepers are not available</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Interlaced-Sleepers.jpg"><img loading="lazy" class="alignnone wp-image-2748" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Interlaced-Sleepers-300x122.jpg" alt="Interlaced Sleepers Points and Crossings Railway" width="615" height="250" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Interlaced-Sleepers-300x122.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Interlaced-Sleepers.jpg 591w" sizes="(max-width: 615px) 100vw, 615px" /></a></span></p>
<h6><span style="font-size: 14pt;">Type of crossings</span></h6>
<p><span style="font-size: 14pt;">to transform from one track to another parallel track</span><br />
<span style="font-size: 14pt;">• Various tracks available are</span><br />
<span style="font-size: 14pt;">• Diamond crossing</span><br />
<span style="font-size: 14pt;">• Cross over</span></p>
<p><span style="font-size: 14pt;">• Scissors cross over</span><br />
<span style="font-size: 14pt;">• Ladder track or gathering lines</span><br />
<span style="font-size: 14pt;">• Gauntlet track</span></p>
<h6><span style="font-size: 14pt;">Diamond crossing</span></h6>
<p><span style="font-size: 14pt;">• It consists of 2 acute angles and 2 obtuse angles</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Diamond-Crossing.jpg"><img loading="lazy" class="aligncenter wp-image-2749" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Diamond-Crossing-300x192.jpg" alt="Diamond Crossing Points and Crossings Railway" width="563" height="360" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Diamond-Crossing-300x192.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Diamond-Crossing.jpg 566w" sizes="(max-width: 563px) 100vw, 563px" /></a></span></p>
<p>&nbsp;</p>
<h6><span style="font-size: 14pt;">Cross Over</span></h6>
<p><span style="font-size: 14pt;"><strong>1.</strong> Provided when one track is to be diverted to another parallel track.</span><br />
<span style="font-size: 14pt;"><strong>2.</strong> It consists of 2 sets of points and 2 acute crossings.</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Cross-Over.jpg"><img loading="lazy" class="alignnone wp-image-2752" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Cross-Over-300x140.jpg" alt="Cross Over Points and Crossings Railway" width="596" height="278" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Cross-Over-300x140.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Cross-Over.jpg 557w" sizes="(max-width: 596px) 100vw, 596px" /></a></span></p>
<h6><span style="font-size: 14pt;">Scissor Cross Over</span></h6>
<p><span style="font-size: 14pt;">• Combination of one cross over with the another one in the opposite direction</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Scissor-Cross-over.jpg"><img loading="lazy" class="alignnone wp-image-2753" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Scissor-Cross-over-300x141.jpg" alt="Scissor Cross over Points and Crossings Railway" width="634" height="298" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Scissor-Cross-over-300x141.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Scissor-Cross-over.jpg 656w" sizes="(max-width: 634px) 100vw, 634px" /></a></span></p>
<h6><span style="font-size: 14pt;">Ladder track or gathering line</span></h6>
<p><span style="font-size: 14pt;">• Number of parallel lanes are connected</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Ladder-track-or-gathering-line-.jpg"><img loading="lazy" class="alignnone wp-image-2754" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Ladder-track-or-gathering-line--300x147.jpg" alt="Ladder track or gathering line Points and Crossings Railway" width="649" height="318" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Ladder-track-or-gathering-line--300x147.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Ladder-track-or-gathering-line-.jpg 653w" sizes="(max-width: 649px) 100vw, 649px" /></a></span></p>
<h6><span style="font-size: 14pt;">Gauntlet Track</span></h6>
<p><span style="font-size: 14pt;">When two tracks of the same or different gauges running parallel to each other, they are converted into a single track at bridges for economizing.</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Gauntlet-Track.jpg"><img loading="lazy" class="alignnone wp-image-2755" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Gauntlet-Track-300x140.jpg" alt="Gauntlet Track Points and Crossings Railway" width="675" height="315" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Gauntlet-Track-300x140.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Gauntlet-Track.jpg 600w" sizes="(max-width: 675px) 100vw, 675px" /></a></span></p>
<h6><span style="font-size: 14pt;">Signalling</span></h6>
<p><span style="font-size: 14pt;">• It consists of systems, devices and means by which trains are operated efficiently and tracks are used to the max. extent Objectives of Signalling.</span><br />
<span style="font-size: 14pt;">• Facilities for efficient movement of trains.</span></p>
<p><span style="font-size: 14pt;">• Safety between trains.</span><br />
<span style="font-size: 14pt;">• Max use of the track.</span><br />
<span style="font-size: 14pt;">• To guide trains movement during maintenance and repairs.</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Signalling.jpg"><img loading="lazy" class="alignnone wp-image-2756" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Signalling-300x90.jpg" alt="Signalling Points and Crossings Railway" width="740" height="222" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Signalling-300x90.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Signalling.jpg 642w" sizes="(max-width: 740px) 100vw, 740px" /></a></span></p>
<h1><a href="https://en.wikipedia.org/wiki/Railroad_switch"><span style="font-size: 14pt;">Points and Crossings Railway</span></a></h1>
<h3><span style="font-size: 14pt;">The classic faction of Signalling</span></h3>
<p><span style="font-size: 14pt;"><strong>1) Operation Characteristics</strong></span><br />
<span style="font-size: 14pt;">a) Detonating (Fog or Audible) signals</span><br />
<span style="font-size: 14pt;">b) Hand (Visual Indication) signals</span><br />
<span style="font-size: 14pt;">c) Fixed (Visual Indication) signals</span></p>
<p><span style="font-size: 14pt;"><strong>2) Functional Characteristics</strong></span><br />
<span style="font-size: 14pt;">a) Stop or Semaphore type signals</span><br />
<span style="font-size: 14pt;">b) Warner signals</span><br />
<span style="font-size: 14pt;">c) Shunting signals</span><br />
<span style="font-size: 14pt;">d) Coloured light signals</span><br />
<span style="font-size: 14pt;">e) Locational Characteristics</span><br />
<span style="font-size: 14pt;">f) Reception Signals: Outer &amp; Home signal</span><br />
<span style="font-size: 14pt;">g) Departure Signals: Starter &amp; Advance starter</span></p>
<h3><span style="font-size: 14pt;">Operation Characteristics</span></h3>
<p><span style="font-size: 14pt;"><strong>1) Detonating (Fog or Audible) signals:</strong> during the foggy &amp; cloudy weather when hand or fixed signals are not visible, detonators are</span><br />
<span style="font-size: 14pt;">placed on rails which explode with a loud when the train passes over them. Generally placed before 400-500m ahead of the signal to enable</span><br />
<span style="font-size: 14pt;">the driver to stop the train or to obey it.</span><br />
<span style="font-size: 14pt;"><strong>2) Hand (Visual Indication) signals:</strong> hand signals are given by flags fixed to wooden handle or by bare arms during day times and lamps with glass sides or green, red and amber during night times. Generally used by guards, station masters, cabin man, gang man, key man or any authorised man.</span><br />
<span style="font-size: 14pt;"><strong>3) Fixed (Visual Indication) signals:</strong> theses signals are usually fixed at a place.</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Operation-Characteristics.jpg"><img loading="lazy" class="aligncenter wp-image-2757" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Operation-Characteristics-300x79.jpg" alt="Operation Characteristics Points and Crossings Railway" width="729" height="192" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Operation-Characteristics-300x79.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Operation-Characteristics.jpg 665w" sizes="(max-width: 729px) 100vw, 729px" /></a></span></p>
<p>&nbsp;</p>
<p><span style="font-size: 14pt;"><strong>1) Stop or Semaphore type signals</strong>: ordinary position is Horizontal but it can be lowered to any angle by pulling</span><br />
<span style="font-size: 14pt;">the wire from the cabin. ON indicates stop or danger, OFF Indicates proceed.</span><br />
<span style="font-size: 14pt;"><strong>2) Warner signals</strong>: similar to semaphore signal at the entrance to the station except for a V-notch at the free end</span></p>
<h3><span style="font-size: 14pt;">Functional Characteristics</span></h3>
<p><span style="font-size: 14pt;"><strong>1) Stop or Semaphore type signals:</strong> ordinary position is Horizontal but it can be lowered to any angle by pulling the wire from the cabin. ON indicates stop or danger, OFF Indicates proceed.</span><br />
<span style="font-size: 14pt;"><strong>2) Warner signals:</strong> similar to semaphore signal at the entrance to the station except for a V-notch at the free end</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Functional-Characteristics-1.jpg"><img loading="lazy" class="wp-image-2758 aligncenter" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Functional-Characteristics-1-300x169.jpg" alt="Functional Characteristics Points and Crossings Railway" width="595" height="335" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Functional-Characteristics-1-300x169.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Functional-Characteristics-1.jpg 475w" sizes="(max-width: 595px) 100vw, 595px" /></a></span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Warner-signals.jpg"><img loading="lazy" class="aligncenter wp-image-2759" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Warner-signals-111x300.jpg" alt="Functional Characteristics Points and Crossings Railway" width="214" height="578" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Warner-signals-111x300.jpg 111w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Warner-signals.jpg 172w" sizes="(max-width: 214px) 100vw, 214px" /></a></span></p>
<p><span style="font-size: 14pt;"><strong>3.</strong> Shunting (Disc or ground) signals: used for shunting operation at station yards. Shape of a circular disc with red band on a white background.  The disc can revolve in a vertical plane by pulling the lever arm.</span><br />
<span style="font-size: 14pt;">• Horizontal positions indicate STOP.</span><br />
<span style="font-size: 14pt;">• Inclined position (450) indicates PROCEED.</span><br />
<span style="font-size: 14pt;"><strong>4)</strong> Coloured light signals: with the introduction of electric traction, semaphore signals are replaced by colour light signals both during day and night.</span></p>
<figure id="attachment_2768" aria-describedby="caption-attachment-2768" style="width: 784px" class="wp-caption aligncenter"><a href="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Color-Light-Signal.jpg"><img loading="lazy" class="wp-image-2768" src="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Color-Light-Signal-300x88.jpg" alt="Color Light Signal Points and Crossings Railway" width="784" height="230" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Color-Light-Signal-300x88.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2019/11/Color-Light-Signal.jpg 647w" sizes="(max-width: 784px) 100vw, 784px" /></a><figcaption id="caption-attachment-2768" class="wp-caption-text"><span style="font-size: 14pt;"><strong>                                                                                        Color Light Signal</strong></span></figcaption></figure>
<p><span style="font-size: 14pt;"><strong>1) Reception Signals:</strong> Signals which control the reception of trains into a station. They are two types i.e Outer &amp; Home signal</span><br />
<span style="font-size: 14pt;">Outer signal – it is the first to stop signal at a station and it must be placed at an adequate distance(0.54km for B.G and 0.4km for M.G) before the railway station.</span><br />
<span style="font-size: 14pt;">Generally, a warner signal is provided. In stop position, the driver must stop the train at a distance of about 90m before the outer signal and then proceed to the home signal with caution</span></p>
<p><span style="font-size: 14pt;"><strong>Home signal</strong> – this signal indicates which line is to be used So main function is to protect the sidings already occupied not more than 180m away from the start of switches</span></p>
<p><span style="font-size: 14pt;"><strong>2) Departure Signals:</strong> Signals which control the dispatch of trains from the station. They are two types i.e Starter &amp; Advance starter</span><br />
<span style="font-size: 14pt;"><strong>• Starter signals –</strong> it is the last stop signal at the station. It is the limit up to which trains at a station come to stand or halt. </span><br />
<span style="font-size: 14pt;"><strong>• Advance starter –</strong> it is the last stop signal at the station. It indicates that the train has left the station and the station master is no more responsible for the station master. 180m beyond the switches.</span></p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.railwaysignallingconcepts.in/points-and-crossings-railway/feed/</wfw:commentRss>
			<slash:comments>2</slash:comments>
		
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 
Minified using Disk

Served from: www.railwaysignallingconcepts.in @ 2026-04-10 11:50:34 by W3 Total Cache
-->