<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Platform Emergency Stop Plunger(PESP) Railway &#8211; Railway Signalling Concepts</title>
	<atom:link href="https://www.railwaysignallingconcepts.in/tag/platform-emergency-stop-plungerpesp-railway/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.railwaysignallingconcepts.in</link>
	<description>Information About Axle Counter,Track Structure Point &#38; Crossing,Cable Schematics,CBTC Equipment,Overlaps,Core Plans,Earthing,ERTMS,Headway Calculation,Hot Axle Box Detectors,Interface Design,Level Crossing,Markers &#38; boards,Bonding Plan Electrical Lockings,Route locking,Automatic Warning Systems AWS,Point Circuit,Equipment Treadle,Track Layout,Track Circuit Interrupters,Train Protection Warning System (TPWS),Slip Siding &#38; Catch Siding.</description>
	<lastBuildDate>Wed, 08 Jun 2022 11:23:28 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.0.11</generator>
	<item>
		<title>Platform Emergency Stop  Plunger(PESP) Railway</title>
		<link>https://www.railwaysignallingconcepts.in/platform-emergency-stop-plungerpesp-railway/</link>
					<comments>https://www.railwaysignallingconcepts.in/platform-emergency-stop-plungerpesp-railway/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sun, 06 Mar 2022 01:59:39 +0000</pubDate>
				<category><![CDATA[Indian Railway Signalling]]></category>
		<category><![CDATA[Network Rail]]></category>
		<category><![CDATA[Presentation]]></category>
		<category><![CDATA[Thales]]></category>
		<category><![CDATA[Local Override]]></category>
		<category><![CDATA[PESP]]></category>
		<category><![CDATA[PESP Symbol shown in SSP]]></category>
		<category><![CDATA[PESP UNIT FOR REFERENCE ONLY]]></category>
		<category><![CDATA[Platform Emergency Stop Plunger(PESP) Railway]]></category>
		<category><![CDATA[SCC OVERRIDE]]></category>
		<guid isPermaLink="false">http://www.railwaysignallingconcepts.in/?p=1076</guid>

					<description><![CDATA[Platform Emergency Stop Plunger(PESP) Railway Platform Emergency Stop Plunger(PESP) Railway :- * Five Emergency Stop Plungers shall be provided at each platform for the use of passengers and staffs to stop the train in case of emergency. * One Emergency Stop Plunger for each platform shall be provided in the Station control Room (SCR) panel. * [&#8230;]]]></description>
										<content:encoded><![CDATA[<h1 style="text-align: center;"><span style="font-size: 14pt; color: #3366ff;">Platform Emergency Stop Plunger(PESP) Railway</span></h1>
<p><span style="font-size: 14pt;"><strong>Platform Emergency Stop Plunger(PESP) Railway :-</strong> * Five Emergency Stop Plungers shall be provided at each platform for the use of passengers and staffs to stop the train in case of emergency.</span></p>
<p><span style="font-size: 14pt;">* One Emergency Stop Plunger for each platform shall be provided in the Station control Room (SCR) panel.</span></p>
<p><span style="font-size: 14pt;">* These are used in an emergency to prevent trains from entering the platform or to emergency brake trains which are already on platform.</span></p>
<p><span style="font-size: 14pt;">* For platforms which are having PDIU then PESP units are not required at platform, only ESP at SCR panel will be provided per platform. Because already the passengers and staffs are protected by platform doors.</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-1.jpg"><img loading="lazy" class="wp-image-1078 aligncenter" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-1-300x205.jpg" alt="Platform Emergency Stop Plungers 1" width="639" height="439" /></a></span></p>
<p><span style="font-size: 14pt;"><strong>PESP UNIT FOR REFERENCE ONLY</strong></span></p>
<p>&nbsp;</p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/PESP-UNIT-FOR-REFERENCE-ONLY.jpg"><img loading="lazy" class=" wp-image-1079 aligncenter" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/PESP-UNIT-FOR-REFERENCE-ONLY-300x241.jpg" alt="PESP UNIT FOR REFERENCE ONLY" width="644" height="517" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/PESP-UNIT-FOR-REFERENCE-ONLY-300x241.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/PESP-UNIT-FOR-REFERENCE-ONLY.jpg 507w" sizes="(max-width: 644px) 100vw, 644px" /></a></span></p>
<p><span style="font-size: 14pt;">* In the PESP unit, the ‘NO’ contact is used to illuminate the PESP indicator when the PESP is activated.</span></p>
<p><span style="font-size: 14pt;">* The ‘NC’ contact of each PESP unit in a platform are proved in series including SCR panel ESP ‘NC’ contact to pickup the PESP activation relay ((PESP) R) in relay rack.</span></p>
<p><span style="font-size: 14pt;">* In normal operation the SCS relay rack shall continuously report in a fail safe manner the status of each platforms PESP to the SCS electronics rack through (PESP)R relay.</span></p>
<p>&nbsp;</p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-2.jpg"><img loading="lazy" class="wp-image-1080 aligncenter" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-2-300x182.jpg" alt="Platform Emergency Stop Plungers 2" width="626" height="380" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-2-300x182.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-2.jpg 564w" sizes="(max-width: 626px) 100vw, 626px" /></a></span></p>
<p><span style="font-size: 14pt;"><strong> If any one of the PESP is activated then</strong></span></p>
<p><span style="font-size: 14pt;">&#8211; the ‘NO’ contact of the activated PESP unit will be closed and WHITE indication will be lighting on PESP unit and SCR panel.</span><br />
<span style="font-size: 14pt;">&#8211; the ‘NC’ contact of the activated PESP unit will be open and the (PESP) R relay will be de-energised. </span></p>
<p><span style="font-size: 14pt;">&#8211; SCS will detect the PESP activation and report the status of activated ESP to VCC.</span><br />
<span style="font-size: 14pt;">&#8211; VCC immediately close the associated tracks containing the activated ESP thus preventing any trains under automatic control from advancing their target point into the closed track. Trains moving those closed tracks will be emergency braked to a stop.</span></p>
<p><span style="font-size: 14pt;">* The plunger operates two ‘push to break’ contacts, and locks in the pushed position. So, if the PESP is activated, then the push button will be locked in pushed position i.e PESP will be in activated position.</span></p>
<p><span style="font-size: 14pt;">* PESP unit is fitted with a key release mechanism to return the plunger to the normal position.</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-4.jpg"><img loading="lazy" class="wp-image-1081 aligncenter" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-4-300x111.jpg" alt="Platform Emergency Stop Plungers 4" width="912" height="338" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-4-300x111.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-4.jpg 581w" sizes="(max-width: 912px) 100vw, 912px" /></a></span></p>
<p><span style="font-size: 14pt;">* The PESP can be overridden by means of a VCC command (SCC override) as well as from the SCR control panel (Local override) on the platform.</span></p>
<p><span style="font-size: 14pt;">* The Local override will be done from SCR panel by station operator, that will bypass the activation of all emergency stop plungers at platform including in the SCR, such that their activation does not close any tracks and affect train operation. </span></p>
<p><span style="font-size: 14pt;">* This local override activation will be indicated in SCR panel and also SMC workstation. The SMC will monitor the active/inactive status of the PESP override device via the SMC PLC non-vital interface.</span></p>
<p><span style="font-size: 14pt;"><strong>(Local Override)</strong></span></p>
<p><span style="font-size: 14pt;">* An override switch per platform is provided in the SCR panel in order to mask the operation of PESP of a particular platform.</span></p>
<p><span style="font-size: 14pt;">* When Local Override is operated in SCR panel then (PESP)(LOR)R relay will be energized in relay rack then the (PESP)R relay will be by-passed.</span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-5.jpg"><img loading="lazy" class="wp-image-1082 aligncenter" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-5-300x214.jpg" alt="Platform Emergency Stop Plungers " width="709" height="506" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-5-300x214.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/Platform-Emergency-Stop-Plungers-5.jpg 382w" sizes="(max-width: 709px) 100vw, 709px" /></a></span></p>
<h3><span style="font-size: 14pt;">SCC OVERRIDE</span></h3>
<p><span style="font-size: 14pt;">* The SCC (Service Control center) override will be done at SCC by VCC operator, to open the closed track to allow the train </span><span style="font-size: 14pt;">operation.</span></p>
<p><span style="font-size: 14pt;">* The VCC will send the status of the override to SMC and SMC will generate a alarm.</span></p>
<p><span style="font-size: 14pt;">* The SMC will send the active/inactive status of ESP override as indicated by VCC via SMC non-vital interface, to provide an indication in the relevant SCR.</span></p>
<p><span style="font-size: 14pt;">* ESP activation will not have any affect on RM mode train operation.</span><br />
<span style="font-size: 14pt;">* ESP activation will not have any affect on Route Secure aspects.</span></p>
<p><span style="font-size: 14pt;">* For stations which are not having SCS, the PESP will be controlled and monitored by adjacent station which is having SCS.</span></p>
<p>&nbsp;</p>
<p><span style="font-size: 14pt;"><strong>PESP Symbol shown in SSP:</strong></span></p>
<p><span style="font-size: 14pt;"><a href="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/PESP-Symbol-shown-in-SSP.jpg"><img loading="lazy" class="wp-image-1083 aligncenter" src="http://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/PESP-Symbol-shown-in-SSP-300x159.jpg" alt="PESP Symbol shown in SSP" width="685" height="363" srcset="https://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/PESP-Symbol-shown-in-SSP-300x159.jpg 300w, https://www.railwaysignallingconcepts.in/wp-content/uploads/2018/11/PESP-Symbol-shown-in-SSP.jpg 556w" sizes="(max-width: 685px) 100vw, 685px" /></a></span></p>
<p>&nbsp;</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.railwaysignallingconcepts.in/platform-emergency-stop-plungerpesp-railway/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Page Caching using Disk: Enhanced 
Minified using Disk

Served from: www.railwaysignallingconcepts.in @ 2026-06-13 05:02:40 by W3 Total Cache
-->