ANR/BNR CIRCUIT – Railway Signalling Concepts https://www.railwaysignallingconcepts.in Information About Axle Counter,Track Structure Point & Crossing,Cable Schematics,CBTC Equipment,Overlaps,Core Plans,Earthing,ERTMS,Headway Calculation,Hot Axle Box Detectors,Interface Design,Level Crossing,Markers & boards,Bonding Plan Electrical Lockings,Route locking,Automatic Warning Systems AWS,Point Circuit,Equipment Treadle,Track Layout,Track Circuit Interrupters,Train Protection Warning System (TPWS),Slip Siding & Catch Siding. Tue, 07 Jun 2022 13:38:05 +0000 en hourly 1 https://wordpress.org/?v=6.0.11 RRI Signal Points With Switche Routes With Buttens NCR RCR RR Relay Circuits https://www.railwaysignallingconcepts.in/rri-signal-points-with-switche-routes-with-buttens-ncr-rcr-rr-relay-circuits/ https://www.railwaysignallingconcepts.in/rri-signal-points-with-switche-routes-with-buttens-ncr-rcr-rr-relay-circuits/#comments Tue, 26 Apr 2022 02:50:13 +0000 http://www.railwaysignallingconcepts.in/?p=830 RRI Signal Points With Switches & Routes With Buttens NCR RCR RR Relay Circuits

RRI Signal, Points With Switches & Routes With Buttens

RRI Signal, Points With Switches & Routes With Buttens

ANR/BNR CIRCUIT

When route button is pressed, the route button relay concerned ANR , BNR etc. picks up.

ANR/BNR CIRCUIT

RR RELAY

RR RELAY: WHEN THE KNOB REVERSED, THE RR CONCERNED PICKS UP PROVING ALL OTHER CONFLICTING SIGNALS NRs IN PICKUP

RR RELAY

LR RELAY

  • As the signal knob is reversed and the route button is pressed, the LR concerned picks up by proving all other conflicting route LRs in drop and conflicting  ASRs in pick up.
  • Once LR pickup it sticks through its own front contact

LR RELAY

NCR/RCR

  • Depending upon the route to be set , the concerned point NCR/RCR( WNR/WRR  in some railways) will energize through NC/RC contact & WLR pick up contact.
  • The moment NCR/RCR picks up , the rest of the point operation is exactly similar to the non-route setting type  panel  point operation.
  • In this way all the points required for the signal route will be set automatically.

 

WLR RELAY

NCR/RCR CIRCUIT

NCR/RCR CIRCUIT

 

RRI Signal, Points With Switches & Routes With Buttens,ANR/BNR CIRCUIT,RR RELAY, NCR/RCR,  NCR, RCR CIRCUIT

 

]]>
https://www.railwaysignallingconcepts.in/rri-signal-points-with-switche-routes-with-buttens-ncr-rcr-rr-relay-circuits/feed/ 3