Commissioner Contents of report | Documents accompanying inspection report | Submission of report to Central Government

Metro Rail Signalling and train control system Installation 

Metro Rail Signalling and train control system Installation  Signals – (1) The signals to be provided for controlling the movements of trains on the metro railway shall be, – (a) Cab signals. (b) Fixed line-side signals (where provided). and (c) Hand signals for shunting purposes. (2) The signalling and train control system shall be Continuous […]

Continue Reading
Railway Signalling layout of signal positioning

Railway Signalling layout of signal positioning

Railway Signalling layout of signal positioning GK/RT0032 – Provision of Lineside signals This document defines the mandatory requirements for the provision of lineside signals and the sequences in which signal aspects shall be presented to train drivers, in respect of plain line, diverging junctions and for bi-directional lines, to enable them to a) stop safely […]

Continue Reading