Headway Calculation and Signalling braking Distance for Railway Signal Placement

Headway Calculation and Signalling braking Distance for Railway Signal Placement

Headway Calculation and Signalling braking Distance for Railway Signal Placement HEADWAY FOR NON-STOPPING TRAINS * HEADWAY CALCULATION IS THE NECESSARY FIRST STEP IN SIGNALLING A LAYOUT It provide best engineering solution , which meet the conflicting requirements of Operational capacity, Safety & cost. * HEADWAY IS A MEASURE OF HOW FREQUENTLY TRAINS CAN RUN. IT […]

Continue Reading
Electrical Detector

Railway Signalling Electrical Detector

Railway Signalling Electrical Detector The electrical detector is an electromechanical device to check the position for correct setting and locking of points through making an electrical contact, which closes a circuit. It has two sets of fixed contacts. In centre, bridging contact assembly on a roller cam shaft, which works in conjunction with the points […]

Continue Reading
Railway Signalling layout of signal positioning

Railway Signalling layout of signal positioning

Railway Signalling layout of signal positioning GK/RT0032 – Provision of Lineside signals This document defines the mandatory requirements for the provision of lineside signals and the sequences in which signal aspects shall be presented to train drivers, in respect of plain line, diverging junctions and for bi-directional lines, to enable them to a) stop safely […]

Continue Reading