Railway Panel Diagram with Switches / Buttons
Railway Panel Diagram with Switches / Buttons Conditions to be satisfied before a signal is cleared: * The concerned buttons or knob has been operated by pressing or turning. * The points required on the route, the overlap and isolation are set and locked correctly and the route is locked. * The track is clear […]
Continue Reading