Headway Calculation and Signalling braking Distance for Railway Signal Placement

Headway Calculation and Signalling braking Distance for Railway Signal Placement

Headway Calculation and Signalling braking Distance for Railway Signal Placement HEADWAY FOR NON-STOPPING TRAINS * HEADWAY CALCULATION IS THE NECESSARY FIRST STEP IN SIGNALLING A LAYOUT It provide best engineering solution , which meet the conflicting requirements of Operational capacity, Safety & cost. * HEADWAY IS A MEASURE OF HOW FREQUENTLY TRAINS CAN RUN. IT […]

Continue Reading
Metro Rail Restricted Manual Mode Cut Out Mode

Metro Rail Emergency track side work traffic hours

Metro Rail Emergency track side work traffic hours Metro Rail Emergency track side work traffic hours – (1) No routine maintenance shall be undertaken during the hours in which train services normally run except as provided for in sub-rule (2). (2) If emergency repair work is required to be carried out to prevent accidents or to maintain or restore […]

Continue Reading