Point switches or keys

RRI Button Circuit

RRI Button Circuit,Route setting system,Combined Indication & control panel,BUTTON SYMBOLS ON PANEL,Button indications,Route initiation,Route initiation circuits,Time delayTFR, DCR, DZR CIRCUITS,Route initiation circuits,Route initiation destination selected,Route initiation – wrong button pressed,(D)R CIRCUITS,(D)R CIRCUITS,Point switches or keys,EGNR CIRCUIT,Route identification ,Route setting,Signal RLR,(S)PR & (D)PR CIRCUITS RRI Button Circuit  points to be operated individually to the required position […]

Continue Reading
Railway Signalling Design Specification Method

Railway Signalling Design Specification Method

Railway Signalling Design Specification Method * A draft specification should be prepared in which all of the topics contained within the following guidelines are considered for inclusion if their application is appropriate to the signalling scheme. * To enable the specification to be recognised within a standard format there may be benefit in providing all headings […]

Continue Reading