Ready to Depart Indicator Railway

Ready to Depart Indicator Railway 

railway indicator board,caution indicator board,indian railway sign boards,railway symbol images,types of railway signals ,detonator in indian railways,speed restriction in indian railway,railway signals pdf Ready to Depart Indicator Railway Introduction: • RTDI will be provided on each platform where staff is assigned to assist in the departure of trains. • The indicator will normally be blank, […]

Continue Reading
SELTRAC System Overview  JNUP Thales

SELTRAC System Overview  JNUP Thales

Jubilee & Northern Line Upgradation Project (JNUP ), SELTRAC System Overview  JNUP Thales, Conventional Systems of Train control,Fixed Block Principles, Moving Block Principles, SelTrac Moving Block Configuration,Vehicle Control Centre (VCC),System Management Centre (SMC), Vehicle On-Board Controller (VOBC), Station Controller Subsystem (SCS), Wayside Equipment – Loops, Feed in Device (FID),Entry Feed in Device (EFID,Loops,Track Terminology, Track Terminology, TBTC Modes, Automatic Mode, Protected Manual Mode, Restricted Manual Mode  SELTRAC […]

Continue Reading
Railway LUL Points

Railway LUL Points

LUL Points, BASIC REQUIREMENTS OF A POINT, INTERLOCKING PRINCIPLES, POINT DEFINITIONS, CIRCUIT DEFINITIONS,Point Circuits, Control Circuits, Control circuit, Detection circuit, Lever Lock Circuit, Ground lock (WL) Circuit, Ground Lock (WL) Circuit Railway LUL Points OVERVIEW * Basic Requirements of a Point * Interlocking Principles * Definitions * Circuit Definitions * General * Components * Point Machines * Supplementary Drives   […]

Continue Reading